Gizmodyne | May 19, 2007
Good times
Let’s Get Ready To Rumble!!!! (Poly)
Time for the last coat before work. Luckily it goes on smooth.
T – 8 Hours
Mission assemble the cabinets and attach face frames.
We decided to atttach the frame to the cabinet that needed a flush edge first. Then screw the second cabinet to this assembly.
Don’t worry OSHA.. This is a [...]
Category: Cabinetry, Kitchen |
No Comments »
Tags: assembly, drawers, hardware
Gizmodyne | May 19, 2007
If you read the last blog you saw our finishing woes. Well, we tried patch sanding the cross grain scratch to no success. So we stripped and sanded the enitre door face and the face frame.
We were under the gun since our project was due to class by Friday night.
48 Hours to Go
The door [...]
Category: Cabinetry, Finishing, Kitchen |
No Comments »
Tags: assembly, base cabinets, staining